Bỏ qua tới nội dung
Pillar 05

Digital Transformation

Digitised data is the backbone of any green strategy. GROW delivers a curated suite of digital transformation solutions at preferential prices, with ESG modules built in from the start.

Summary

The Digital Transformation pillar brings together two directions: digital transformation (DX) and green transformation (GX). GROW provides an EMS platform (energy management), an ERP with an ESG module, blockchain traceability, and a cloud migration programme with member-preferential pricing. Businesses that deploy the full package typically save 25–40% on operating costs within 24 months.

Four core solution groups

Energy management system (EMS): IoT sensors plus a cloud dashboard, deployed in 6–10 weeks. Costs start from VND 180 million for a small plant and typically pay back within 12–18 months.

ERP with an integrated ESG module: emissions are recorded the moment a transaction is logged, and GRI reports are generated automatically. Suited to businesses with 100+ employees.

Blockchain traceability: meets the requirements of CBAM, LWG and international brands. Suited to the textiles, footwear, seafood and timber sectors.

Cloud migration & cloud optimisation: move IT infrastructure to green cloud, cutting Scope 2 emissions from IT by 40–70%.

A flexible deployment model

GROW does not do the work for you — we curate the best technology partners for Vietnamese SMEs, negotiate community pricing (30–50% cheaper than buying on your own), and coordinate deployment. This lets SMEs access the same technology as large enterprises, but at a cost that fits their scale.

Key services

  • EMS & IoT systems for real-time measurement
  • ERP with an automated ESG module
  • Blockchain traceability for exports
  • Cloud migration for SMEs
  • ESG reporting dashboard for leadership
Book a free consultationSee the full ecosystem

Frequently asked questions

Do small SMEs really need an EMS?

If your electricity bill exceeds VND 200 million a year, an EMS typically pays back within 12–18 months. Below that threshold, GROW recommends starting with simple energy management tools first.

How long does a full DX+GX package take to deploy?

Usually 10–14 months for the full package. It can be broken down by workshop or by process if a business wants to test it before scaling up.

Is the software compatible with our existing systems?

The solutions GROW selects all offer open APIs and connect to common ERP/CRM systems (SAP, Oracle, Odoo, Bravo, Misa, Fast).

Related pillars